Georgia energy details: floors and ceilings

Floor insulation: R-19 in Zones 3 and 4

Georgia amends 2015 IECC Table R402.1.2. For floors:

  • Climate Zone 2: R-13
  • Climate Zones 3 and 4: R-19

So a house in Climate Zone 4 needs R-19 floor insulation. The traps: R-13 is the floor value for Climate Zone 2 only, R-30 is the cantilevered-floor value, and R-38 is the ceiling value, not a floor value.

Cantilevered floors: R-30 plus blocking

Footnote j to Georgia's Table R402.1.2 covers a cantilevered floor over outside air, such as a second-floor bedroom projecting past the wall below. It requires:

  • R-30 insulation (equivalent to U-0.035 under footnote d of Table R402.1.4);
  • blocking of the band area above the supporting wall;
  • air sealing of any penetrations in that blocking.

R-19 alone is the ordinary floor value, not the cantilever value. A vapor retarder is not what the footnote requires, and R-38 with no blocking is wrong on both counts.

R-30 can satisfy an R-38 ceiling

Under Georgia's amended R402.2.1, where R-38 is required, R-30 over 100% of the ceiling area satisfies it wherever full-height, uncompressed R-30 extends completely over the wall top plate at the eaves.

  • Partial coverage such as 80% does not qualify; the text says 100%.
  • A radiant barrier is not the condition.
  • The trade-off does not apply under the U-factor alternative (R402.1.4) or the total UA alternative (R402.1.5).

HVAC platforms in the attic: R-19

The same Georgia R402.2.1 deems R-19 to meet R-38 beneath an attic HVAC platform, for up to 32 sq ft of decking per HVAC system, plus a passage up to 32 in wide to the equipment, per IRC M1305.1.2.

The traps: the allowance is 32 sq ft per system, not 100 sq ft per house; R-30 over 50 sq ft mixes in the eave trade-off value; and R-13 is the wall value, with no basis for a whole platform.