Bolting before release

The general rule: two bolts, wrench-tight

Before a solid web structural member is released from the hoisting line, 29 CFR 1926.756(a)(1) requires, at each connection:

  • at least two bolts,
  • of the size and strength shown on the erection drawings,
  • drawn up wrench-tight or the equivalent specified by the structural engineer of record.

Finger-tight does not meet the wrench-tight requirement. Four is not a bolt count: it is the minimum number of anchor rods per column under 1926.755(a)(1).

Diagonal bracing: one bolt

Solid web members used as diagonal bracing are the exception. Under 1926.756(b) they need at least one bolt per connection, drawn up wrench-tight.

The trap runs both ways: applying the two-bolt rule of (a)(1) to diagonal bracing is the common mix-up, and so is using the one-bolt bracing rule for ordinary members. There is no two-and-one split in the rule. Match the member to its paragraph:

  • ordinary solid web member: two bolts, 1926.756(a)(1)
  • solid web member used as diagonal bracing: one bolt, 1926.756(b)

Cantilevers: a competent person decides

Under 1926.756(a)(2), a competent person decides whether a cantilevered member needs more than two bolts before it is released from the hoisting line. That judgment adds bolts for cantilevers; it does not remove the one-bolt minimum for bracing.

Do not hand this decision to the wrong party:

  • The project structural engineer of record approves anchor rod repairs, replacements and field modifications under 1926.755(b)(1), and specifies wrench-tight equivalents, but is not named for the cantilever bolt count.
  • The controlling contractor notifies the erector in writing about anchor rod changes under 1926.755(b)(2).
  • The crane operator is given no decision in 1926.756.

The quick memory line: two bolts for members, one for diagonal bracing, and a competent person on cantilevers.

Knowledge check

3 questions on what you just read. Each answer shows the full explanation and its source.