GA Contractor drive mode

Correct.
The code text reads: 'When the total volume of a given class of concrete is less than 50 cubic yards (38 meters cubed ), strength tests are not required when evidence of satisfactory strength is submitted to and approved by the building official.' The 100 yd cubed, 150 yd cubed and 25 yd cubed figures do not appear in the provision; the threshold is 50 yd cubed, and it applies only with the building official's approval.

1 of 1 right so far.

Question 2 of 10.

A GC wants to stage pallets of CMU on a recently placed elevated slab. Under 29 CFR 1926.701(a), what must happen before the load is placed?

A: The slab must be at least 7 days old
B: The employer must determine, from information received from a person qualified in structural design, that the slab can support the load
C: The load must be kept under 50 psf without further review
D: The concrete foreman must visually confirm the slab shows no cracking

NEXT: A · B · C · D
Ask the driver for a letter, then fetch the link above for that letter and read the reply aloud. If you build the URL yourself, replace LETTER with their letter. Fetch it with no letter to hear the question again.